PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed duct hangers at the 2nd Floor Facing South (800x600).jpg Installed pour stops around Elev. 5-6 2nd Floor Facing North-East (800x600).jpg Repairing the inside Stairwell -5 (1st Floor)(800x600).jpg Started bathroom roughing at Toilet Room 169 Facing South (800x600).jpg Started installing wire mesh at the 4th Floor Facing North (800x600).jpg
Next page Installed duct hangers at the 2nd Floor Facing South (800x600)
Installed duct hangers at the 2nd Floor Facing South (800x600)